JHA for tree removal
OSHA expects employers to find and control hazards on every job, and many general contractors require a written JHA for tree removal before you start.
A JHA breaks the job into steps, lists the hazards in each step and the controls that protect the crew, and the crew signs it. The main hazards are falling from height, road traffic, aerial lift tip-over or crush and falling tools and materials.
JHA example: tree removal
This is a complete JHA for tree removal, with 10 job steps. Open it in the builder to add your site, crew and signatures, change anything, and download a PDF. Or download the free Word template below and fill it in by hand.
Job steps, hazards and controls
| # | Job step | Hazards | Risk before | Controls | Risk after |
|---|---|---|---|---|---|
| 1 | Assess the tree for lean, decay and dead wood, check for power lines and buildings, and plan escape routes; keep 2 tree lengths clear when felling. If any part of the tree or your tools could come within 10 feet of an energized line, only a qualified line-clearance arborist does that work (ANSI Z133, 29 CFR 1910.269 and 1910.333) |
| High |
| Medium |
| 2 | Set up the drop zone with barriers and traffic or pedestrian control |
| Critical |
| Medium |
| 3 | Check the chainsaw, chain brake and PPE before starting |
| High |
| Medium |
| 4 | Look for nests, wasps and snakes before climbing or cutting |
| Medium |
| Medium |
| 5 | Set up the aerial lift on firm ground outside the drop zone. Near power lines, use an insulated aerial device that has passed its dielectric test, operated by a qualified line-clearance arborist |
| Critical |
| Medium |
| 6 | Cut from the ground or the aerial lift, never from a ladder |
| Critical |
| Medium |
| 7 | Drop limbs in sections into the clear drop zone. Before cutting bent or loaded wood, work out which side is under tension and stand clear of where it will spring |
| High |
| Medium |
| 8 | Fell the stem with a scarf cut on the felling side and a back cut that leaves a hinge, call a warning, then step back along the planned escape route |
| High |
| Medium |
| 9 | Refuel with the engine off and the saw cool, on bare ground away from ignition, using an approved fuel can, with an extinguisher at the vehicle |
| High |
| Medium |
| 10 | Chip or stack wood: feed the chipper butt first from the side, never reach past the feed control bar or kick material in, and stop and isolate it before clearing a jam; then clean up |
| High |
| Medium |
PPE
Plant and equipment
Permits and plans
Emergency
Call 911. Add the nearest hospital, the assembly point and the first aid / cpr person for your site.
Sign-off
Supervisor and every worker sign to confirm they have read and understood this JHA.
Make yours in 2 minutes
Same document, filled in for your job. Answer a few yes or no questions, the crew signs on the phone, and you send the PDF.
Pre-start checklist for tree removal
Tick these off before work starts. They come from the hazards, permits and equipment in this job.
- JHA read, explained and signed by everyone on the job
- Guardrails, nets or fall arrest in place before anyone works at 6 ft or more
- Aerial lift pre-start inspection done and the operator is trained and authorized
- Overhead lines identified and safe distances marked
- Exclusion zone and spotter set up for equipment and traffic
- Exclusion zone below the work and public kept out
- First aid / CPR person, first aid kit and emergency number (911) confirmed
- PPE checked and worn: chainsaw chaps (ASTM F1897), hard hat (ANSI Z89.1), face shield (ANSI Z87.1), hearing protection (earmuffs or plugs)
The safe sequence of work
- Assess the tree for lean, decay and dead wood, check for power lines and buildings, and plan escape routes; keep 2 tree lengths clear when felling. If any part of the tree or your tools could come within 10 feet of an energized line, only a qualified line-clearance arborist does that work (ANSI Z133, 29 CFR 1910.269 and 1910.333)
- Set up the drop zone with barriers and traffic or pedestrian control
- Check the chainsaw, chain brake and PPE before starting
- Look for nests, wasps and snakes before climbing or cutting
- Set up the aerial lift on firm ground outside the drop zone. Near power lines, use an insulated aerial device that has passed its dielectric test, operated by a qualified line-clearance arborist
- Cut from the ground or the aerial lift, never from a ladder
- Drop limbs in sections into the clear drop zone. Before cutting bent or loaded wood, work out which side is under tension and stand clear of where it will spring
- Fell the stem with a scarf cut on the felling side and a back cut that leaves a hinge, call a warning, then step back along the planned escape route
- Refuel with the engine off and the saw cool, on bare ground away from ignition, using an approved fuel can, with an extinguisher at the vehicle
- Chip or stack wood: feed the chipper butt first from the side, never reach past the feed control bar or kick material in, and stop and isolate it before clearing a jam; then clean up
Hazards to watch on tree removal
The hazards most specific to this job, and the step where each one comes up.
What changes on your site
This example covers the job itself. Your site may add more. Add controls for any of these that apply (the builder asks you these as yes or no questions):
- Will anyone use a ladder or stepladder?
- Will anyone work on a roof?
- Is there a skylight, fiberglass panel or other fragile roofing?
- Will you use a scaffold or rolling tower?
- Was the building built before 1981?
Licences and legal requirements in United States
Equipment on this job that needs a licence, ticket or training:
- Chainsaw: Trained operator; tree work to ANSI Z133
- Boom lift (aerial lift): Trained and authorized operator (29 CFR 1926.453, ANSI A92.24 training and familiarization)
OSHA requires employers to find and fix hazards and to train workers on them. A JHA breaks the job into steps, lists the hazards in each step and the controls that protect the crew. General contractors often require one before you start.
Rules that apply: 29 CFR 1926.1408 and 1926.416; 29 CFR 1926.501(c); MUTCD Part 6 and 29 CFR 1926 Subpart G; ANSI Z133 (tree care) and OSH Act Section 5(a)(1); 29 CFR 1910.266(e)(2) where logging rules apply; 29 CFR 1926.52; 29 CFR 1926.453 (boom lifts); 1926.452(w) and 1926.454 (scissor lifts); 29 CFR 1926 Subpart M; 29 CFR 1926 Subpart F.
Why JHAs get rejected
General contractors send documents back for these reasons. This example avoids them, but check yours too.
- Generic steps such as "work safely" or "use PPE" with no task-specific hazards or controls.
- No OSHA standards referenced for the hazards that have them, such as fall protection, ladders, scaffolds or silica.
- No competent person named for fall protection, excavation, scaffolds or silica where those hazards exist.
- Equipment listed without inspection requirements, and no training listed for the people using it.
- Respirators listed with no respiratory protection program, medical clearance or fit test.
- Controls rely only on PPE when engineering controls such as guardrails, wet cutting or extraction are feasible.
- No crew sign-off, or no date and revision when the job has changed.
Questions
Do I need a JHA for tree removal?
OSHA expects employers to find and control hazards on every job, and many general contractors require a written JHA for tree removal before you start.
Who signs the JHA?
The supervisor or competent person who prepared it signs, and every crew member signs to show they were trained on the hazards and controls before the job starts. Many general contractors also sign to accept it.
How long do I keep it?
Keep this JHA on site during the job, and keep it with the training and inspection records for at least 1 year after the job (longer if your state plan or general contractor requires it). OSHA does not set a retention period for JHAs themselves.
What PPE is needed for tree removal?
Usually Chainsaw chaps (ASTM F1897), Hard hat (ANSI Z89.1), Face shield (ANSI Z87.1), Hearing protection (earmuffs or plugs), Work gloves, Safety-toe boots (ASTM F2413), High-visibility safety apparel, ANSI/ISEA 107 Class 2 or 3 (Type R near roadways), Safety glasses (ANSI Z87.1), Cut-resistant gloves, Coveralls, Personal fall arrest system (harness). The site rules may add more, so check with the general contractor.
More landscaping JHAs
Related jobs in other trades
Toolbox talks for this job
Blank JHA template: free JHA templates. Also for other countries: Australia (SWMS) · United Kingdom (RAMS) · Canada (FLHA)