Method statement for airless spraying
You must assess the risks of airless spraying and record the significant findings if you employ 5 or more people. On CDM sites the principal contractor will ask for RAMS before you start.
RAMS cover the hazards, who could be harmed and how, the controls and the safe sequence of work, and the crew is briefed and signs. The main hazards are flammable liquids and gases, fire and emergencies, hazardous chemicals and eye injuries.
RAMS example: airless spraying
This is a complete RAMS for airless spraying, with 6 job steps. Open it in the builder to add your site, crew and signatures, change anything, and download a PDF. Or download the free Word template below and fill it in by hand.
Risk assessment
| # | Activity | Hazards | Who might be harmed | Risk before | Controls | Risk after |
|---|---|---|---|---|---|---|
| 1 | Mask off and ventilate the area, and remove ignition sources |
| Workers, Occupants, Public, Visitors | High (10) |
| Medium (5) |
| 2 | Check hoses and tip guard, and lock the trigger when not spraying |
| Workers, Occupants | Medium (9) |
| Medium (6) |
| 3 | Never point the gun at anyone or put a hand near the tip |
| Workers | Medium (8) |
| Low (4) |
| 4 | Spray with a respirator and goggles, keeping others out |
| Workers, Occupants, People nearby | Medium (9) |
| Medium (6) |
| 5 | Release pressure before cleaning or changing tips |
| Workers | Medium (8) |
| Low (4) |
| 6 | Clean the pump and dispose of solvent waste properly |
| Workers, Occupants, Public, Visitors | High (10) |
| Medium (5) |
Method statement: sequence of work
- Mask off and ventilate the area, and remove ignition sources
- Check hoses and tip guard, and lock the trigger when not spraying
- Never point the gun at anyone or put a hand near the tip
- Spray with a respirator and goggles, keeping others out
- Release pressure before cleaning or changing tips
- Clean the pump and dispose of solvent waste properly
PPE
Plant and equipment
Permits and plans
Emergency
Call 999. Add the nearest A&E, the assembly point and the first aider for your site.
Sign-off
Supervisor and every worker sign to confirm they have read and understood this RAMS.
Free RAMS template for airless spraying
Word (.docx) and PDF, A4 landscape, no email needed. Fill in your site details, then print or send it.
Make yours in 2 minutes
Same document, filled in for your job. Answer a few yes or no questions, the crew signs on the phone, and you send the PDF.
Pre-start checklist for airless spraying
Tick these off before work starts. They come from the hazards, permits and equipment in this job.
- RAMS read, explained and signed by everyone on the job
- Isolation, lockout and test for dead done before work starts
- First aider, first aid kit and emergency number (999) confirmed
- PPE checked and worn: half-mask respirator (P3 filters), safety goggles, coveralls, chemical-resistant gloves
The safe sequence of work
- Mask off and ventilate the area, and remove ignition sources
- Check hoses and tip guard, and lock the trigger when not spraying
- Never point the gun at anyone or put a hand near the tip
- Spray with a respirator and goggles, keeping others out
- Release pressure before cleaning or changing tips
- Clean the pump and dispose of solvent waste properly
Hazards to watch on airless spraying
The hazards most specific to this job, and the step where each one comes up.
What changes on your site
This example covers the job itself. Your site may add more. Add controls for any of these that apply (the builder asks you these as yes or no questions):
- Will anyone work at height, anywhere a fall could hurt them?
- Will anyone use a ladder or stepladder?
- Will anyone work on a roof?
- Is there a fragile roof, skylight or clear roof sheet?
- Will you use a scaffold or mobile tower?
Licences and legal requirements in United Kingdom
Equipment on this job that needs a licence, ticket or training:
- Mobile access tower: PASMA certificate
- Scissor lift (MEWP): IPAF PAL card (3a)
Employers must assess the risks of their work and record the significant findings (required where you employ 5 or more people). On CDM projects, contractors give their RAMS to the principal contractor before starting, and brief the workers on it.
Rules that apply: Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR); CDM 2015 regs 29 to 31 (fire on construction sites). Occupied premises: Regulatory Reform (Fire Safety) Order 2005 (England and Wales), Fire (Scotland) Act 2005, Fire Safety Regulations (NI) 2010; COSHH Regulations 2002.
Why RAMS get rejected
Principal contractors send documents back for these reasons. This example avoids them, but check yours too.
- The method statement is only a list of headings that repeats the risk table and never says how the work is done.
- The method sequence does not match the risk assessment, for example the method strips the roof before the scaffold is handed over.
- Residual risk is still High after controls with no extra measures or explanation.
- It reads as copied: another firm, another address, or wording that does not fit UK sites. HSE warns that copying an example and adding your name does not satisfy the law.
- Work on an older building with no reference to an asbestos survey.
- Plant and access equipment listed with no inspection, thorough examination or competence evidence.
- No briefing record, no revision history, or no named supervisor.
Questions
Do I need RAMS for airless spraying?
You must assess the risks of airless spraying and record the significant findings if you employ 5 or more people. On CDM sites the principal contractor will ask for RAMS before you start.
Who signs the RAMS?
The person who wrote it and the person who approved it sign and date it. Every worker signs the briefing register after it is explained to them, and the principal contractor reviews and accepts it before you start.
How long do I keep it?
Keep this RAMS, every revision and the signed briefing register with the site file for the length of the job, and keep a copy in your records afterwards.
What PPE is needed for airless spraying?
Usually Half-mask respirator (P3 filters), Safety goggles, Coveralls, Chemical-resistant gloves, Safety boots, Safety glasses, Rigger gloves, Cut-resistant gloves, Face shield. The site rules may add more, so check with the principal contractor.