Method statement for steel fabrication
You must assess the risks of steel fabrication and record the significant findings if you employ 5 or more people. On CDM sites the principal contractor will ask for RAMS before you start.
RAMS cover the hazards, who could be harmed and how, the controls and the safe sequence of work, and the crew is briefed and signs. The main hazards are welding and cutting fumes, being hit by mobile plant, fire from hot works and saw cuts and kickback.
RAMS example: steel fabrication
This is a complete RAMS for steel fabrication, with 6 job steps. Open it in the builder to add your site, crew and signatures, change anything, and download a PDF. Or download the free Word template below and fill it in by hand.
Risk assessment
| # | Activity | Hazards | Who might be harmed | Risk before | Controls | Risk after |
|---|---|---|---|---|---|---|
| 1 | Move steel with a forklift or overhead crane, keeping walkways clear |
| Workers, Visitors, Public | Very high (15) |
| Medium (5) |
| 2 | Cut and drill steel with guards in place |
| Workers, People nearby | High (12) |
| Medium (8) |
| 3 | Weld in a booth with extraction |
| Workers, People nearby, Occupants, Public | Very high (16) |
| Medium (8) |
| 4 | Handle hot and sharp parts with gloves |
| Workers | Medium (8) |
| Low (4) |
| 5 | Store gas bottles upright and chained |
| Workers, Occupants, Public, People nearby | High (10) |
| Medium (5) |
| 6 | Sweep up slag and offcuts |
| Workers, Visitors | Medium (8) |
| Low (4) |
Method statement: sequence of work
- Move steel with a forklift or overhead crane, keeping walkways clear
- Cut and drill steel with guards in place
- Weld in a booth with extraction
- Handle hot and sharp parts with gloves
- Store gas bottles upright and chained
- Sweep up slag and offcuts
PPE
Plant and equipment
Permits and plans
Emergency
Call 999. Add the nearest A&E, the assembly point and the first aider for your site.
Sign-off
Supervisor and every worker sign to confirm they have read and understood this RAMS.
Free RAMS template for steel fabrication
Word (.docx) and PDF, A4 landscape, no email needed. Fill in your site details, then print or send it.
Make yours in 2 minutes
Same document, filled in for your job. Answer a few yes or no questions, the crew signs on the phone, and you send the PDF.
Pre-start checklist for steel fabrication
Tick these off before work starts. They come from the hazards, permits and equipment in this job.
- RAMS read, explained and signed by everyone on the job
- Hot work permit issued, extinguisher at hand, fire watch arranged
- Exclusion zone and spotter set up for plant and traffic
- First aider, first aid kit and emergency number (999) confirmed
- PPE checked and worn: welding helmet, welding gauntlets, safety boots, safety glasses
The safe sequence of work
- Move steel with a forklift or overhead crane, keeping walkways clear
- Cut and drill steel with guards in place
- Weld in a booth with extraction
- Handle hot and sharp parts with gloves
- Store gas bottles upright and chained
- Sweep up slag and offcuts
Hazards to watch on steel fabrication
The hazards most specific to this job, and the step where each one comes up.
What changes on your site
This example covers the job itself. Your site may add more. Add controls for any of these that apply (the builder asks you these as yes or no questions):
- Will anyone work at height, anywhere a fall could hurt them?
- Will anyone use a ladder or stepladder?
- Will anyone work on a roof?
- Is there a fragile roof, skylight or clear roof sheet?
- Will you use a scaffold or mobile tower?
Licences and legal requirements in United Kingdom
Equipment on this job that needs a licence, ticket or training:
- Forklift truck: Accredited forklift training (e.g. RTITB, ITSSAR, CPCS or NPORS)
- Mobile crane: CPCS or NPORS crane operator card, plus slinger signaller card; lift plan by an Appointed Person
Employers must assess the risks of their work and record the significant findings (required where you employ 5 or more people). On CDM projects, contractors give their RAMS to the principal contractor before starting, and brief the workers on it.
Rules that apply: CDM Regulations 2015 and PUWER 1998; Lifting Operations and Lifting Equipment Regulations 1998 (LOLER); Provision and Use of Work Equipment Regulations 1998 (PUWER); Control of Noise at Work Regulations 2005; COSHH Regulations 2002; CDM 2015 regs 29 to 31 (fire on construction sites). Occupied premises: Regulatory Reform (Fire Safety) Order 2005 (England and Wales), Fire (Scotland) Act 2005, Fire Safety Regulations (NI) 2010; Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR).
Why RAMS get rejected
Principal contractors send documents back for these reasons. This example avoids them, but check yours too.
- The method statement is only a list of headings that repeats the risk table and never says how the work is done.
- The method sequence does not match the risk assessment, for example the method strips the roof before the scaffold is handed over.
- Residual risk is still High after controls with no extra measures or explanation.
- It reads as copied: another firm, another address, or wording that does not fit UK sites. HSE warns that copying an example and adding your name does not satisfy the law.
- Work on an older building with no reference to an asbestos survey.
- Plant and access equipment listed with no inspection, thorough examination or competence evidence.
- No briefing record, no revision history, or no named supervisor.
Questions
Do I need RAMS for steel fabrication?
You must assess the risks of steel fabrication and record the significant findings if you employ 5 or more people. On CDM sites the principal contractor will ask for RAMS before you start.
Who signs the RAMS?
The person who wrote it and the person who approved it sign and date it. Every worker signs the briefing register after it is explained to them, and the principal contractor reviews and accepts it before you start.
How long do I keep it?
Keep this RAMS, every revision and the signed briefing register with the site file for the length of the job, and keep a copy in your records afterwards.
What PPE is needed for steel fabrication?
Usually Welding helmet, Welding gauntlets, Safety boots, Safety glasses, Ear defenders, Coveralls, Hi-vis vest, Safety helmet, Rigger gloves, FFP3 dust mask, Face shield, Cut-resistant gloves, Half-mask respirator (P3 filters), Safety goggles. The site rules may add more, so check with the principal contractor.
More welding and fabrication RAMS
Related jobs in other trades
Toolbox talks for this job
Blank RAMS template: free RAMS templates. Also for other countries: Australia (SWMS) · United States (JHA) · Canada (FLHA)