JHA for interior painting
OSHA expects employers to find and control hazards on every job, and many general contractors require a written JHA for interior painting before you start.
A JHA breaks the job into steps, lists the hazards in each step and the controls that protect the crew, and the crew signs it. The main hazards are lead paint dust and fumes, falling from a ladder, flammable liquids and gases and working in an occupied home or building.
JHA example: interior painting
This is a complete JHA for interior painting, with 6 job steps. Open it in the builder to add your site, crew and signatures, change anything, and download a PDF. Or download the free Word template below and fill it in by hand.
Job steps, hazards and controls
| # | Job step | Hazards | Risk before | Controls | Risk after |
|---|---|---|---|---|---|
| 1 | Agree work areas with occupants and protect floors and furniture |
| Medium |
| Low |
| 2 | Test old paint for lead before sanding |
| High |
| Low |
| 3 | Fill and sand walls with a dust mask and vacuum sander |
| Medium |
| Medium |
| 4 | Paint from a platform ladder, not chairs or tins |
| High |
| Medium |
| 5 | Keep windows open and lids on tins |
| High |
| Medium |
| 6 | Clean brushes away from drains and clear drop sheets |
| Medium |
| Low |
PPE
Plant and equipment
Emergency
Call 911. Add the nearest hospital, the assembly point and the first aid / cpr person for your site.
Sign-off
Supervisor and every worker sign to confirm they have read and understood this JHA.
Free JHA template for interior painting
Word (.docx) and PDF, Letter landscape, no email needed. Fill in your site details, then print or send it.
Make yours in 2 minutes
Same document, filled in for your job. Answer a few yes or no questions, the crew signs on the phone, and you send the PDF.
Pre-start checklist for interior painting
Tick these off before work starts. They come from the hazards, permits and equipment in this job.
- JHA read, explained and signed by everyone on the job
- Ladder inspected, secured and extending 3 ft above the landing
- First aid / CPR person, first aid kit and emergency number (911) confirmed
- PPE checked and worn: safety-toe boots (ASTM F2413), safety glasses (ANSI Z87.1), N95 respirator, chemical-resistant gloves
The safe sequence of work
- Agree work areas with occupants and protect floors and furniture
- Test old paint for lead before sanding
- Fill and sand walls with a dust mask and vacuum sander
- Paint from a platform ladder, not chairs or tins
- Keep windows open and lids on tins
- Clean brushes away from drains and clear drop sheets
Hazards to watch on interior painting
The hazards most specific to this job, and the step where each one comes up.
What changes on your site
This example covers the job itself. Your site may add more. Add controls for any of these that apply (the builder asks you these as yes or no questions):
- Will anyone work 6 feet or more above a lower level?
- Will anyone work on a roof?
- Is there a skylight, fiberglass panel or other fragile roofing?
- Will you use a scaffold or rolling tower?
- Will you use an aerial lift (scissor lift or boom lift)?
Why JHAs get rejected
General contractors send documents back for these reasons. This example avoids them, but check yours too.
- Generic steps such as "work safely" or "use PPE" with no task-specific hazards or controls.
- No OSHA standards referenced for the hazards that have them, such as fall protection, ladders, scaffolds or silica.
- No competent person named for fall protection, excavation, scaffolds or silica where those hazards exist.
- Equipment listed without inspection requirements, and no training listed for the people using it.
- Respirators listed with no respiratory protection program, medical clearance or fit test.
- Controls rely only on PPE when engineering controls such as guardrails, wet cutting or extraction are feasible.
- No crew sign-off, or no date and revision when the job has changed.
Questions
Do I need a JHA for interior painting?
OSHA expects employers to find and control hazards on every job, and many general contractors require a written JHA for interior painting before you start.
Who signs the JHA?
The supervisor or competent person who prepared it signs, and every crew member signs to show they were trained on the hazards and controls before the job starts. Many general contractors also sign to accept it.
How long do I keep it?
Keep this JHA on site during the job, and keep it with the training and inspection records for at least 1 year after the job (longer if your state plan or general contractor requires it). OSHA does not set a retention period for JHAs themselves.
What PPE is needed for interior painting?
Usually Safety-toe boots (ASTM F2413), Safety glasses (ANSI Z87.1), N95 respirator, Chemical-resistant gloves, Half-face respirator (P100 cartridges), Coveralls, Work gloves, Knee pads, Hard hat (ANSI Z89.1), Safety goggles (ANSI Z87.1). The site rules may add more, so check with the general contractor.