| 1 | Check the asbestos survey; older wet areas often have asbestos sheeting | | Critical | - Treat insulation, surfacing and resilient flooring in buildings built before 1981 as asbestos unless testing shows otherwise, and get the owner's asbestos survey before you start. Elimination
- Seal off the work area and keep everyone else out. Engineering (guarding)
- If asbestos must be disturbed, keep it wet, use hand tools not power tools, and clean up with a HEPA vacuum. Engineering
- Follow 29 CFR 1926.1101: competent person, work class, regulated area and exposure monitoring. Administrative
- Commercial renovation and any demolition need a NESHAP asbestos inspection first, and demolition needs written notice to the state or EPA 10 working days before work starts (40 CFR 61 Subpart M). Administrative
- Roofing felts, cement shingles and siding, roof coatings and old panel backboards can also contain asbestos. Test them or treat them as asbestos; asbestos roofing is removed intact with hand tools by trained workers (29 CFR 1926.1101(g)(8)). Administrative
- Stop work straight away if you find suspect asbestos. Do not touch it and tell your supervisor. Administrative
- Wear a fit-tested NIOSH-approved respirator suited to the work class, and disposable coveralls. PPE
| Medium |
| 2 | Separate the work area from occupants with dust screens and keep a toilet available | - Working in an occupied home or building
- General dust
| Medium | - Plan noisy, dusty or risky work for when the building is empty. Elimination
- Close off the work area with barriers, plastic sheeting or locked doors, and put up signs. Engineering (guarding)
- Keep fire exits and paths clear at all times. Administrative
- Tell occupants before you turn off power, water or gas, and before noisy or dusty work. Administrative
- Lock away tools, chemicals and materials each day, out of reach of children. Administrative
- Clean up dust and debris at the end of each day. Administrative
- Use low-dust products, such as dust-reduced or pre-mixed compounds. Substitution
- Seal off the work area with plastic sheeting in occupied buildings. Engineering (guarding)
- Use tools with dust extraction and a vacuum for clean up. Engineering
- Lightly mist the area with water to keep dust down, away from anything electrical. Engineering
- Never dry sweep or blow dust off with compressed air. Administrative
- Wear a dust mask and safety glasses. PPE
| Low |
| 3 | Isolate water and power to the room, apply lockout/tagout | - Electric shock from live wiring
- Stored energy
| Critical | - Isolate the power before any work. Do not work live. Elimination
- Lock out and tag the disconnecting means with your own personal lock and tag so the circuit cannot be energized (29 CFR 1926.417). Engineering (guarding)
- Test before you touch: prove dead at the point of work with a tested voltage tester. Engineering
- Only qualified persons work on or near exposed energized parts. Administrative
- Check for back feeds from solar, batteries and generators that can keep a circuit live after the main switch is off. Administrative
- If energized work cannot be avoided, use an energized work permit, a safety observer and insulated tools, following NFPA 70E. Administrative
- Wear insulated gloves, arc-rated clothing and a face shield when testing or working near live parts. PPE
- Release or block all stored energy before work: release the pressure in pipes, tanks and hoses, bleed hydraulics, release springs, lower loads. Elimination
- Lock out and tag all energy sources with personal locks. Engineering (guarding)
- Put mechanical blocks or props under raised parts like buckets, tipper bodies and doors. Engineering
- Test that the system is dead and nothing can move before you start. Administrative
- Follow the maker's procedure, for example for garage door and roller door springs. Administrative
- Wear safety glasses and gloves. PPE
| Medium |
| 4 | Remove fixtures, the toilet and glass shower screens carefully | - Glass handling and breakage
- Lifting and carrying heavy loads
- Sewage and wastewater
| High | - Use suction lifters, glass trolleys or a glazing robot for large panes. Engineering
- Store glass upright on racks and secure it. Never lay it flat or lean it loosely. Engineering
- Use two or more people for large panes, and clear the carry route first. Administrative
- Mark new glass with tape or stickers so nobody walks into it. Administrative
- Clean up broken glass straight away into a marked container. Administrative
- Plan to avoid carrying: have materials delivered, and old items picked up, as close as possible to where they are used. Elimination
- Use lighter or smaller loads: order smaller bags and shorter lengths, and drain or break down old items before moving them. Substitution
- Lifting and carrying heavy loads: see step 8 for the full controls Administrative
- Flush and drain the line before opening it, and plan the job to avoid contact. Elimination
- Use drain cameras, jetters and long-handled tools to keep hands out. Engineering
- Cover cuts with waterproof dressings. Never eat, drink or smoke before washing. Administrative
- Wash hands well and clean tools and boots after the job. Administrative
- Keep vaccinations such as tetanus and hepatitis A up to date, on medical advice. Administrative
| Medium |
| 5 | Strip tiles and linings with dust control | - Silica dust from concrete, brick, stone and tiles
- Loud noise
- Hand-arm and whole-body vibration
| Critical | - Order materials cut to size, or use low-dust methods such as score and snap or a block splitter. Substitution
- Cut outdoors or in a separate area, with other people well away and upwind. Engineering (guarding)
- Use wet cutting or on-tool dust collection with a HEPA vacuum, as set out in Table 1 of 29 CFR 1926.1153. Engineering
- Clean up with a vacuum or wet methods. Never dry sweep or use compressed air. Administrative
- Have a written exposure control plan and a competent person for silica (29 CFR 1926.1153). Administrative
- Workers who must wear a respirator 30 or more days a year get a free medical exam every 3 years (29 CFR 1926.1153(h)). Administrative
- Wear the respirator Table 1 lists for the task: APF 10 (a fit-tested N95 or half mask) for most tasks, APF 25 (such as a loose-fitting PAPR) for tuckpointing with a handheld grinder for more than 4 hours a shift. PPE
- Use quieter tools and methods, such as cut-to-size materials, low-noise machines and battery tools. Substitution
- Keep noisy plant away from work areas, and use screens or distance between the noise and people. Engineering (guarding)
- Keep tools maintained and use mufflers on compressors and generators. Engineering
- Limit time on noisy tools and rotate workers. Administrative
- If you have to shout to be heard at arm's length, wear hearing protection. Administrative
- Use low-vibration tools and methods, such as a breaker on an excavator instead of a hand jackhammer. Substitution
- Keep tools sharp and well maintained, and use anti-vibration handles and seats. Engineering
- Limit trigger time on high-vibration tools and rotate workers. Administrative
- Keep hands warm and dry, and take regular breaks. Administrative
- Report tingling, numbness or white fingers early. Administrative
| Medium |
| 6 | Check for mould, rot and damaged framing once linings are off | - Mold and droppings
- Structural collapse during alterations
| High | - Fix the water leak and dry the area before removing mold. Elimination
- Seal off the area with plastic sheeting and keep occupants out. Engineering (guarding)
- Clean up with a HEPA vacuum and wet wipes. Never dry sweep. Engineering
- Bag moldy material on site and remove it promptly. Administrative
- Wash hands and face before eating and at the end of each shift. Administrative
- Wear an N95 (or better) respirator, gloves, goggles and disposable coveralls. PPE
- Get an engineer to check before removing any wall, beam, post or bracing that may be load-bearing. Elimination
- Keep everyone clear of the area under and next to the work. Engineering (guarding)
- Install temporary props, needles or shoring as designed before removing any support. Engineering
- Follow the engineer's sequence. Do not change it without approval. Administrative
- Check props daily. Do not remove them until the permanent support is in and approved. Administrative
- Wear a hard hat and safety boots. PPE
| Medium |
| 7 | Rough in plumbing and electrical by licensed trades | - Electric shock from live wiring
- Fire from hot works
| Critical | - Electric shock from live wiring: see step 3 for the full controls Administrative
- Use cold work methods where you can, such as bolting, press fittings or cutting with a saw instead of a torch. Elimination
- Move anything that can burn at least 35 feet away, or cover it with fire blankets. Engineering (guarding)
- Use fire-resistant screens to stop sparks reaching people or gaps in walls and floors. Engineering
- Get a hot work permit before starting. Administrative
- Keep a charged fire extinguisher and fire blanket at the work spot. Administrative
- Keep a fire watch during the work and for at least 60 minutes after you finish (NFPA 51B), longer if the permit says so. Administrative
- Check for smoldering behind walls, in ceilings and under floors before you leave. Administrative
- Wear flame-resistant clothing, welding gloves and eye or face protection. PPE
| Medium |
| 8 | Sheet and waterproof with good ventilation | - Hazardous chemicals
- Lifting and carrying heavy loads
| High | - Choose the least harmful product that does the job, for example water-based instead of solvent-based. Substitution
- Use chemicals in well-ventilated areas, or use fans and extraction in closed rooms. Engineering
- Read the Safety Data Sheet (SDS) and labels before use, following OSHA Hazard Communication. Administrative
- Keep chemicals in labeled containers. Never pour them into drink bottles. Administrative
- Store chemicals away from heat, food and drink, and keep products that react with each other apart. Administrative
- Have eye wash and a spill kit nearby, and wash hands before eating. Administrative
- Wear chemical-resistant gloves and safety glasses or goggles as listed on the SDS. PPE
- Use a respirator with the right cartridge if the SDS calls for one. PPE
- Plan to avoid carrying: have materials delivered, and old items picked up, as close as possible to where they are used. Elimination
- Use lighter or smaller loads: order smaller bags and shorter lengths, and drain or break down old items before moving them. Substitution
- Use trolleys, pallet jacks, hoists, vacuum lifters or plant instead of carrying by hand. Engineering
- Use a two-person lift for anything heavy, long or awkward. Plan the route first and clear it. Administrative
- Keep the load close, back straight and no twisting. Turn with your feet. Administrative
- Rotate tasks and take breaks on long lifting jobs. Administrative
- Wear gloves for grip and safety boots to protect your feet. PPE
| Medium |
| 9 | Tile, cutting wet | - Silica dust from concrete, brick, stone and tiles
- Saw cuts and kickback
- Repetitive work and awkward postures
| Critical | - Silica dust from concrete, brick, stone and tiles: see step 5 for the full controls Administrative
- Keep blade guards fitted and working, and use the riving knife on table saws. Engineering
- Use push sticks and clamps, and support long pieces so they do not pinch the blade. Engineering
- Use a sharp, undamaged blade made for the material. Administrative
- Stand to one side of the blade line, out of the kickback path. Administrative
- Let the blade stop fully before reaching in or putting the saw down. Administrative
- Use tools that cut the effort: powered screwdrivers, long-handled tools and extension poles for overhead work. Substitution
- Set work up at waist height on benches or trestles where you can. Engineering
- Use light tools with good grips, and keep blades and bits sharp. Engineering
- Rotate tasks and take short breaks every hour on repetitive work. Administrative
- Warm up before heavy physical work and report aches and pains early. Administrative
| Medium |
| 10 | Fit off fixtures, test and clean up | - Slips and trips
- Poor housekeeping and waste
| Medium | - Plan walkways and keep them clear of materials, hoses and leads. Elimination
- Run cords and hoses overhead on hooks or stands, or along walls, not across walkways. Engineering
- Fill or cover holes, and lay boards or mats on muddy access paths. Engineering
- Clean up offcuts, packaging and spills as you go, not at the end of the day. Administrative
- Keep work areas, stairs and access paths well lit. Administrative
- Wear safety boots with good grip, laced up. PPE
- Order materials to size and send packaging back where you can. Elimination
- Put dumpsters and waste chutes close to the work. Engineering
- Clean as you go, and do a full clean up at the end of each day. Administrative
- Keep exits, stairs and walkways clear at all times. Administrative
- Stack materials neatly on level ground, away from edges. Administrative
- Wear gloves when handling waste. PPE
| Low |