JHA for shower waterproofing
OSHA expects employers to find and control hazards on every job, and many general contractors require a written JHA for shower waterproofing before you start.
A JHA breaks the job into steps, lists the hazards in each step and the controls that protect the crew, and the crew signs it. The main hazards are silica dust from concrete, brick, stone and tiles, electric shock from cords and power tools, loud noise and flammable liquids and gases.
JHA example: shower waterproofing
This is a complete JHA for shower waterproofing, with 9 job steps. Open it in the builder to add your site, crew and signatures, change anything, and download a PDF. Or download the free Word template below and fill it in by hand.
Job steps, hazards and controls
| # | Job step | Hazards | Risk before | Controls | Risk after |
|---|---|---|---|---|---|
| 1 | Check the substrate is sheeted, clean, dry and cured, and keep occupants out of the room |
| Medium |
| Low |
| 2 | Read the safety data sheets and set up fans or open windows, as solvent membranes give off fumes |
| Medium |
| Medium |
| 3 | Have a licensed electrician isolate or make safe outlets and lights in the room if they will get wet, and run tools through GFCI protection |
| High |
| Low |
| 4 | Prepare the surface, grinding with extraction |
| Critical |
| Medium |
| 5 | Fit bond breakers, puddle flanges and angles |
| Medium |
| Medium |
| 6 | Prime the surface, keeping all ignition sources away until it is dry |
| High |
| Medium |
| 7 | Apply the membrane in coats with nitrile gloves and the respirator the SDS lists (an organic vapour cartridge for solvent or polyurethane products), kneeling on pads |
| Medium |
| Medium |
| 8 | Let it cure, then flood test |
| Medium |
| Low |
| 9 | Clean tools and dispose of waste membrane and tins properly |
| Medium |
| Medium |
PPE
Plant and equipment
Emergency
Call 911. Add the nearest hospital, the assembly point and the first aid / cpr person for your site.
Sign-off
Supervisor and every worker sign to confirm they have read and understood this JHA.
Free JHA template for shower waterproofing
Word (.docx) and PDF, Letter landscape, no email needed. Fill in your site details, then print or send it.
Make yours in 2 minutes
Same document, filled in for your job. Answer a few yes or no questions, the crew signs on the phone, and you send the PDF.
Pre-start checklist for shower waterproofing
Tick these off before work starts. They come from the hazards, permits and equipment in this job.
- JHA read, explained and signed by everyone on the job
- Water suppression or on-tool extraction fitted; respirators fit tested
- First aid / CPR person, first aid kit and emergency number (911) confirmed
- PPE checked and worn: chemical-resistant gloves, safety glasses (ANSI Z87.1), half-face respirator (P100 cartridges), knee pads
The safe sequence of work
- Check the substrate is sheeted, clean, dry and cured, and keep occupants out of the room
- Read the safety data sheets and set up fans or open windows, as solvent membranes give off fumes
- Have a licensed electrician isolate or make safe outlets and lights in the room if they will get wet, and run tools through GFCI protection
- Prepare the surface, grinding with extraction
- Fit bond breakers, puddle flanges and angles
- Prime the surface, keeping all ignition sources away until it is dry
- Apply the membrane in coats with nitrile gloves and the respirator the SDS lists (an organic vapour cartridge for solvent or polyurethane products), kneeling on pads
- Let it cure, then flood test
- Clean tools and dispose of waste membrane and tins properly
Hazards to watch on shower waterproofing
The hazards most specific to this job, and the step where each one comes up.
What changes on your site
This example covers the job itself. Your site may add more. Add controls for any of these that apply (the builder asks you these as yes or no questions):
- Will anyone work 6 feet or more above a lower level?
- Will anyone use a ladder or stepladder?
- Will anyone work on a roof?
- Is there a skylight, fiberglass panel or other fragile roofing?
- Will you use a scaffold or rolling tower?
Why JHAs get rejected
General contractors send documents back for these reasons. This example avoids them, but check yours too.
- Generic steps such as "work safely" or "use PPE" with no task-specific hazards or controls.
- No OSHA standards referenced for the hazards that have them, such as fall protection, ladders, scaffolds or silica.
- No competent person named for fall protection, excavation, scaffolds or silica where those hazards exist.
- Equipment listed without inspection requirements, and no training listed for the people using it.
- Respirators listed with no respiratory protection program, medical clearance or fit test.
- Controls rely only on PPE when engineering controls such as guardrails, wet cutting or extraction are feasible.
- No crew sign-off, or no date and revision when the job has changed.
Questions
Do I need a JHA for shower waterproofing?
OSHA expects employers to find and control hazards on every job, and many general contractors require a written JHA for shower waterproofing before you start.
Who signs the JHA?
The supervisor or competent person who prepared it signs, and every crew member signs to show they were trained on the hazards and controls before the job starts. Many general contractors also sign to accept it.
How long do I keep it?
Keep this JHA on site during the job, and keep it with the training and inspection records for at least 1 year after the job (longer if your state plan or general contractor requires it). OSHA does not set a retention period for JHAs themselves.
What PPE is needed for shower waterproofing?
Usually Chemical-resistant gloves, Safety glasses (ANSI Z87.1), Half-face respirator (P100 cartridges), Knee pads, N95 respirator, Safety-toe boots (ASTM F2413), Safety goggles (ANSI Z87.1), Coveralls, Work gloves, Hearing protection (earmuffs or plugs), Cut-resistant gloves. The site rules may add more, so check with the general contractor.
More tiling JHAs
Related jobs in other trades
Toolbox talks for this job
Blank JHA template: free JHA templates. Also for other countries: Australia (SWMS) · United Kingdom (RAMS) · Canada (FLHA)