SWMS for re-roofing
Yes. Re-roofing usually includes high risk construction work (risk of a person falling more than 2 metres; work in an area with movement of powered mobile plant), so a SWMS is required by law before work starts.
It must list the hazards, the controls and how they will be put in place, monitored and reviewed, and the workers must be consulted and sign before starting. The main hazards are falling from a roof edge, falling from height, disturbing asbestos and scaffold collapse or fall from scaffold.
SWMS example: re-roofing
This is a complete SWMS for re-roofing, with 11 job steps. Open it in the builder to add your site, crew and signatures, change anything, and download a PDF. Or download the free Word template below and fill it in by hand.
High risk construction work covered
Job steps, hazards and controls
| # | Job step | Hazards | Risk before | Controls | Risk after |
|---|---|---|---|---|---|
| 1 | Check the asbestos register and get any asbestos roof removed by a licensed removalist first |
| Extreme |
| Medium |
| 2 | Check the weather and power lines, and plan the crane, hoist and skip bin positions |
| High |
| Medium |
| 3 | Erect full perimeter scaffold edge protection, a waste chute and an exclusion zone below |
| Extreme |
| Medium |
| 4 | Strip the old roof in sections so the building stays covered if rain comes |
| Extreme |
| Medium |
| 5 | Lower waste in the chute or by crane, never throw it off |
| High |
| Medium |
| 6 | Check and repair the roof framing, guarding any gaps |
| Extreme |
| Medium |
| 7 | Install safety mesh, sarking and battens |
| Extreme |
| Medium |
| 8 | Land new roofing materials by crane or hoist, spreading loads across the frame |
| High |
| Medium |
| 9 | Lay the new roof, taking breaks in heat and sun |
| High |
| Medium |
| 10 | Fit flashings, ridge capping, gutters and downpipes |
| High |
| Medium |
| 11 | Clean the roof and site, then dismantle scaffold once the roof is signed off |
| Extreme |
| Medium |
PPE
Plant and equipment
Permits and plans
Emergency
Call 000. Add the nearest hospital, the assembly point and the first aider for your site.
Sign-off
Supervisor and every worker sign to confirm they have read and understood this SWMS.
Free SWMS template for re-roofing
Word (.docx) and PDF, A4 landscape, no email needed. Fill in your site details, then print or send it.
Make yours in 2 minutes
Same document, filled in for your job. Answer a few yes or no questions, the crew signs on the phone, and you send the PDF.
Pre-start checklist for re-roofing
Tick these off before work starts. They come from the hazards, permits and equipment in this job.
- SWMS read, explained and signed by everyone on the job
- Edge protection installed and checked before anyone works above 2 m
- Fragile roof areas and skylights covered or barricaded
- Scaffold tagged, with a handover certificate if over 4 m
- Overhead lines identified and safe distances marked
- Asbestos register or survey checked for the work area
- Exclusion zone below the work and public kept out
- Weather checked: water, shade and rest breaks planned
- Wind and weather checked; stop work limits agreed
- First aider, first aid kit and emergency number (000) confirmed
- PPE checked and worn: steel cap boots, safety harness and lanyard, hard hat, cut-resistant gloves
The safe sequence of work
- Check the asbestos register and get any asbestos roof removed by a licensed removalist first
- Check the weather and power lines, and plan the crane, hoist and skip bin positions
- Erect full perimeter scaffold edge protection, a waste chute and an exclusion zone below
- Strip the old roof in sections so the building stays covered if rain comes
- Lower waste in the chute or by crane, never throw it off
- Check and repair the roof framing, guarding any gaps
- Install safety mesh, sarking and battens
- Land new roofing materials by crane or hoist, spreading loads across the frame
- Lay the new roof, taking breaks in heat and sun
- Fit flashings, ridge capping, gutters and downpipes
- Clean the roof and site, then dismantle scaffold once the roof is signed off
Hazards to watch on re-roofing
The hazards most specific to this job, and the step where each one comes up.
What changes on your site
This example covers the job itself. Your site may add more. Add controls for any of these that apply (the builder asks you these as yes or no questions):
- Will anyone use a ladder or stepladder?
- Will you use an EWP (scissor lift or boom lift)?
- Will you sand, scrape, cut or heat paint on a building built before 1997?
- Will you cut, grind or drill concrete, brick, stone, tiles or fibre cement?
- Will you remove, cut, repair or dispose of an existing engineered stone benchtop?
Licences and legal requirements in Australia
This task can involve these high risk construction work categories under the WHS Regulations:
- Risk of a person falling more than 2 metres
- Work in an area with movement of powered mobile plant
Equipment on this job that needs a licence, ticket or training:
- Fixed scaffold: Scaffolding HRWL (SB, SI or SA) to erect, alter or dismantle where a fall of more than 4 m is possible
- Crane (Franna or mobile): HRWL for the crane class (e.g. C2, CN, C6), plus Dogging licence (DG) where slinging needs judgement or the load is out of the operator's view
- Telehandler: 3 t or less: trained and assessed (VOC). Over 3 t with a jib, hook or winch: High Risk Work Licence CN (non-slewing mobile crane). Slewing telehandlers: slewing crane licence (C2, C6 and up). Victoria: any non-slewing telehandler over 3 t needs CN or the Victorian telehandler licence
A SWMS must be prepared before any high risk construction work starts. It must list the high risk work, the hazards and risks, the control measures, and how those controls will be put in place, monitored and reviewed. It must be easy for the workers to read and understand.
Rules that apply: WHS Regulations, Chapter 8 (Asbestos); WHS Regulation 2011, Part 4.5 High risk work and Part 5.1 Plant; WHS Regulation 2011, Part 4.4 Falls; WHS Regulation 2011, Part 4.4 Falls, Part 5.1 Plant and r.225 (scaffolds); WHS Regulation 2011, Part 3.2 (falling objects); WHS Regulation 2011, Part 4.2 Hazardous manual tasks.
Each state has its own regulator and some extra rules: New South Wales, Victoria, Queensland, Western Australia, South Australia and Australian Capital Territory.
Why SWMS get rejected
Principal contractors send documents back for these reasons. This example avoids them, but check yours too.
- It is generic: another site address, tasks that are not on this job, or no sign it was reviewed for this site. WorkSafe WA says a generic SWMS may not meet the regulations unless it is reviewed and amended for the workplace.
- The HRCW boxes are not ticked, or the ticks do not match the tasks (for example a roof job with no falls box ticked).
- Falls are controlled only by "be careful", training or a harness, with no edge protection or scaffold and no reason why higher controls are not reasonably practicable.
- Workers will clip on to a harness but there is no rescue plan for someone left hanging.
- The "how controls are implemented, monitored and reviewed" part is missing, or it says the same thing on every row.
- No worker sign-on, no person responsible for compliance, or a date given to the principal contractor that is before they actually received it.
- Licence or White Card details are missing for workers operating plant or doing licensed high risk work.
Questions
Do I need a SWMS for re-roofing?
Yes. Re-roofing usually includes high risk construction work (risk of a person falling more than 2 metres; work in an area with movement of powered mobile plant), so a SWMS is required by law before work starts.
Who signs the SWMS?
The person conducting the business (PCBU) or their supervisor prepares it with the workers, and every worker doing the high risk work signs to show they were consulted and understand it. Give a copy to the principal contractor before work starts.
How long do I keep it?
Keep this SWMS, and every revised version, until the high risk construction work is finished, where workers and inspectors can see it on site. If a notifiable incident happens during the work, keep it for at least 2 years after the incident.
What PPE is needed for re-roofing?
Usually Steel cap boots, Safety harness and lanyard, Hard hat, Cut-resistant gloves, Safety glasses, P2 dust mask, Hearing protection (earmuffs or plugs), Sun protection (brim hat, long sleeves, SPF 50+), Half-face respirator (P2 or P3 filters), Overalls, Work gloves, Hi-vis shirt or vest, Face shield. The site rules may add more, so check with the principal contractor.